Ympäristödata
Total energy consumption 1) in the organization
Mwh |
2021 | Change compared with base year 2015, % | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
Energy consumption, total | 1,143,487 | -20% | 1,112,013 | 1,206,097 | 1,201,831 | 1,268,992 | 1,256,865 | 1,422,063 |
1) Total enery consumption is a sum of energy usage for electricity, district heating and cooling and fuels.
GHG emissions from NCC’s operations
Market-based calculation method |
2021 | Change compared with base year 2015, % | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
GHG emissions (1) CO2e (tons, 000) | 185 | -41 | 185 | 216 | 227 | 260 | 267 | 312 |
– of which, Scope 1 (2) | 181 | –30 | 179 | 209 | 217 | 234 | 223 | 255 |
– of which, Scope 2 (3) | 4 | -89 | 6 | 7 | 10 | 26 | 44 | 37 |
Net sales, SEK M | 53,414 | 53,922 | 58,234 | 57,346 | 54,608 | 52,934 | 53,116 | |
Emission intensity: CO2e (tons)/SEK M |
3.5 | –42 | 3.4 | 3.7 | 4.0 | 4.8 | 5.0 | 5.9 |
CO2e (ton)/MWh | 0,163 | –26 | 0,166 | 0,179 | 0,189 | 0,205 | 0,212 | 0,219 |
Location based calculation method CO2e (tons) | 9,619 | 59 | 9,933 | 12,184 | 11,360 | 11,078 | 8,929 | 24,280 |
1) The greenhouse gases N2O, CH4 and CO2 are included in the calculations.
2) Refers to direct emissions from NCC’s operations, of which 0.7 (tons 000) derived from the combustion of biomass (2020).
3) Refers to indirect emissions from electricity and heat.
Scope 3

Waste management
Residual product and waste category |
2021 | 2020 | 2019 | ||||
Total weight, tons | % | Total weight, tons | % | Total weight, tons | % | ||
Non-hazardous waste | |||||||
Sorting | 11% | 8,189 | 17% | 9,802 | 19% | ||
Energy recycling | 14% | 9,023 | 19% | 8,894 | 18% | ||
Reuse/materials recycling | 37,036 | 69% | 27,563 | 58% | 27,662 | 55% | |
Plastic | 1,069 | ||||||
Wood | 14,149 | ||||||
Gypsum | 3,825 | ||||||
Metal | 11,664 | ||||||
Concrete, bricks, tiles/clinkers | 1,546 | ||||||
Other reuse/recycling | 4,783 | ||||||
Landfill | 1,445 | 5% | 5% | 60% | |||
Hazardous waste | |||||||
Special treatment | 608 | 1% | 1% | 2% | |||
Total amount | 53,667 | 47,580 | 50,058 |
In 2021, the total amount of waste increased somewhat, in part due to reporting being expanded to include more fractions. However, the rate of sorting targeted at reuse/recycling continues to rise and has risen from 48 percent in 2016 to 69 percent in 2021. Work is continuing to reduce the amount of waste and to ensure that the rate of sorting continues to increase during 2021. The statistics cover traditional construction waste. Soil, stone and fill materials, which are directly dependent on the projects’ geography, are usually handled separately and are not included in the statistics. Concrete, bricks and tiles/clinkers are recycled to some extent and are reported for parts of the operations.
Ympäristödata ladattavassa muodossa