E-mail: viestit@ncc.fi

We offer paving methods for all types of sites and uses.
Our asphalt product range includes a safe solution for all kinds of pavement needs. We produce the pavements with our extensive stationary asphalt plant network, mobile asphalt plants, re-surfacing machinery and paving machinery.
The most important paving works along with AB and SMA pavements are ART re-surfacing and soft mix paving that we produce with our special methods.

NCC Roads Oy
Äyritie 8 C
FIN-01510 Vantaa
Tel. +358 10 507 6800
E-mail: nccroads@ncc.fi
From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 22% VAT)
From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 22% VAT)
When calling from abroad the price is determined by the local operator.