Close
Search for:

Kerbstones and railings

We cast high-class, economical concrete kerbstones and railings by utilising slip casting technology.

We cast and reinforce kerbstones and railings onsite as unified structures. The height of our products can range from a couple of centimetres to several metres, and the length can be several kilometres.

One of the benefits of a product cast onsite is the speed of installation; the construction process will only minimally disturb surrounding traffic.

Kerabstones and railings
 

Contact information

NCC Roads Oy
Äyritie 8 C
FI-01510 Vantaa
Tel. +358 10 5076 800
E-mail: nccroads@ncc.fi

 

Prices for 010 numbers

From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 22% VAT)

From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 22% VAT)

When calling from abroad the price is determined by the local operator.

 
Tell a friend
Tell a friend

Tell a friend

You wish to tell your friend about page "Kerbstones and railings."

Your friends email address

If you want to send a message to more than one friend, separate email addresses with commas.

Your own name or email

Your message


 

Back to top