NCC companies, PO Box 13, FI-00281 Helsinki, tel. +358 10 507 51
E-mail: viestit@ncc.fi

Densit pavements are solutions for sites where traditional pavements cannot withstand the stress to which they are subjected.
Densiphalt combines the flexibility, seamlessness and high load-bearing capacity of asphalt and the durability of concrete.
Densitop is a cement-based industrial floor material for sites where floor coating has to endure a lot of wear and tear.

NCC Roads Oy
Äyritie 8 C
FI-01510 Vantaa
Tel. +358 10 5076 800
E-mail: nccroads@ncc.fi
From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 22% VAT)
From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 22% VAT)
When calling from abroad the price is determined by the local operator.