Close
Search for:

Asphalt products

Our asphalt product range includes a safe solution for all kinds of pavement needs.

Asphalt is great pavement choice when the surface coating has to be distinguished, easy to maintain and durable. Asphalt is easy to clean and there is no need for maintenance; ploughing the snow from a paved yard is easy. Asphalt can sustain heavy loads and is durable; thus it is well suited to sites with extensive wear and tear.

In addition to regular asphalt products, we offer specialty asphalts with additional properties such as silence, density or colour.

Asphalt products
 

Contact information

NCC Roads Oy
Äyritie 8 C
FI-01510 Vantaa
Tel. +358 10 507 6800
E-mail: nccroads@ncc.fi

 

Prices for 010 numbers

From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 22% VAT)

From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 22% VAT)

When calling from abroad the price is determined by the local operator.

 
Tell a friend
Tell a friend

Tell a friend

You wish to tell your friend about page "Asphalt products."

Your friends email address

If you want to send a message to more than one friend, separate email addresses with commas.

Your own name or email

Your message


 

Back to top