E-mail: viestit@ncc.fi

Buildings constructed in the 1960s and 70s are requiring more and more major renovations. It is also becoming increasingly challenging to manage these buildings in an energy efficient manner. Is it possible for elderly residents to move around in the building and continue to live at home? Should a lift be added to the building?
If nothing is done, the unsatisfactory situation will only become worse. The technical condition of the building will continue to deteriorate, and additional costs and lost profits will ensue. At the same time, there may be an opportunity to add new apartments in the attic or build a whole new building on the same plot of land to fund the absolutely necessary major renovations.
NCC’s experienced and competent renovation team can assist you in this. Let’s agree on cooperation in a manner that suits you. We have a great deal of experience in renovating a number of residential buildings and adding new lifts, and are prepared to take full responsibility for the project, including project planning, condition surveys, design activities and high-quality renovation. If necessary, we can also take responsibility for the maintenance.

NCC Construction Ltd
Head office
Mannerheimintie 103a
PO Box 13
FI-00281 Helsinki
Renovation services
Tel. +358 10 507 5588
E-mail: asiakaspalvelu@ncc.fi
From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 23% VAT)
From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 23% VAT)
When calling from abroad the price is determined by the local operator.