Close
Search for:

Repair plan

Is it difficult to draw up a repair budget for your residential property or is it difficult to see the big picture? How can the issue be presented at the housing company’s general meeting, for example? Would it be beneficial for the residents and shareholders to anticipate future repair needs?

Anticipating future repair needs will soon be required by law. Drawing up plans often takes an unreasonable amount of the building manager’s time, and is often done without separate compensation.

NCC offers its computational expertise free of charge in the form of the NCC Repair Calendar, which is a free housing company repair needs survey and preliminary repair cost assessment tool designed for housing companies and building managers.

By entering the basic data of your housing company into the calendar you will receive a report on the future repair needs and their costs. You can use the report in planning repairs or in decision-making within the housing company.

Repair plan

 

Contact information

NCC Construction Ltd
Head office
Mannerheimintie 103a
PO Box 13
FI-00281 Helsinki

Renovation services
Tel. +358 10 507 5588
E-mail: asiakaspalvelu@ncc.fi

 

Prices for 010 numbers

From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 23% VAT)

From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 23% VAT)

When calling from abroad the price is determined by the local operator.

 

 

 

Tell a friend
Tell a friend

Tell a friend

You wish to tell your friend about page "Repair plan."

Your friends email address

If you want to send a message to more than one friend, separate email addresses with commas.

Your own name or email

Your message


 

Back to top