Close
Search for:

Periodical repairs

Is a traditional condition survey or announcements made by residents not enough to manage your repair needs? Are you continuously surprised by the apartments’ repair needs or are you always hearing about new humidity damage? Is it difficult for you to prepare for repairs or budget for them?

Uncontrolled repair needs cause unnecessary costs and quick fixes or repairing hidden damage later on may be expensive; the residents will not be happy when minor faults and defects persist year in and year out.

NCC has been developing the periodical repair concept for a long time. The idea is simple: trained repair personnel carry out a condition survey of the property’s apartments and public premises, and then compile a report on repair needs. They also carry out any agreed minor repairs when performing the survey, so the residents see that something is being done and the owner is provided with a report listing the major problems.

Contact information

NCC Construction Ltd
Head office
Mannerheimintie 103a
PO Box 13
FI-00281 Helsinki

Renovation services
Tel. +358 10 507 5588
E-mail: asiakaspalvelu@ncc.fi

 

Prices for 010 numbers

From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 23% VAT)

From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 23% VAT)

When calling from abroad the price is determined by the local operator.

 


 

Tell a friend
Tell a friend

Tell a friend

You wish to tell your friend about page "Periodical repairs."

Your friends email address

If you want to send a message to more than one friend, separate email addresses with commas.

Your own name or email

Your message


 

Back to top