Close
Search for:

EkoConcept

A building is an investment in the future. NCC’s EkoConcept concept offers you a building that is affordable to build and will remain affordable for the entire duration of its lifecycle.

EkoConcept is a new type of partnership scheme NCC has developed based on the construction lifecycle thinking.

Benefits for the entire lifecycle

EkoConcept offers major benefits during the entire lifecycle of the building, from design to maintenance, together with reliable information to support investment decisions and point out the building use and maintenance expense levels in the years to come.

Most of the lifecycle costs of a building are already known at the design stage. However, investment decisions are often made by studying the construction costs and not taking account of the investment decision’s impacts on consequent use and maintenance costs.

Operations model offering added value for customers

EkoConcept connects design, construction and, if required, maintenance into a single entity; a solution that will be affordable for the entire lifecycle of the building and will meet the customer’s spatial needs. The most important feature of EkoConcept is the customer-specific optimisation of lifecycle costs, the building’s properties, the investment costs and the environmental loads.

If you tell us about your spatial needs, we can offer you information on the alternatives available and their costs. The tool we use is EstiModel, software used to define the investment costs, lifecycle costs and environmental loads of a building. We control the design activities with EstiModel so that your financial and business objectives will be reached.



Tapiola Health Centre was built as a life cycle project.


NCC's Ekoconcept

  • a cooperation model based on construction lifecycle thinking
  • offers reliable information to support investment decisions
  • enables major cost savings during use of the building
  • can be used with both new buildings and renovated buildings
 
 

Contact information

NCC Construction Ltd
PO Box 13
FI-00281 Helsinki
Tel. +358 10 507 51
E-mail: viestit@ncc.fi

 
 

Further information

Matti Aho
Vice President
Tel. +358 10 507 5627

E-mail is formed as follows: firstname.lastname@ncc.fi

 

Prices for 010 numbers

From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 22% VAT)

From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 22% VAT)

When calling from abroad the price is determined by the local operator.

 
Tell a friend
Tell a friend

Tell a friend

You wish to tell your friend about page "EkoConcept."

Your friends email address

If you want to send a message to more than one friend, separate email addresses with commas.

Your own name or email

Your message


 

Back to top