- Area in total 6 hectares
- Business premises approx 25.000 m2
- 4-5 buildings
- Manufacturing-, storage-, office-, sales- and/or service facilities
- High or normal ceiling height
- Construction starts during spring 2011


The Intro4 will rise by the Helsinki-Lahti motorway in the city of Järvenpää with over 25.000 square metres of tailored business premises. Intro4 can offer facilities for large as well as small and medium- sized enterprises.
Intro4 will rise by the Helsinki-Lahti motorway, in Järvenpää, halfway between the southern and northern extensions leading to the town. The location is ideal logistically, between the national road 4 (E75) and Lahti highway (road 140), especially for the companies in need of convenient connections in every direction.
All facilities will be tailored to accommodate your needs. Intro4 can offer facilities for manufacturing or storage as well as for office, sales and service purposes or combination of these. The facilities will be designed to be easily modifiable which makes it possible for the companies to expand when they grow or make changes in their production process.
We pay special attention to environmental issues. Intro4 will be built according to NCC’s EkoConsept, its focus being in customer-oriented optimization of lifecycle costs, building’s characteristics, investment costs and the environmental loads.
NCC companies
PO Box 13
FI-00281 Helsinki
Tel. +358 10 507 51
E-mail: viestit@ncc.fi
Mauri Sahi
Project
Manager
Tel.
+358 10 507 5492
E-mail is formed as follows:
firstname.lastname@ncc.fi
From a domestic landline phone: 8.21 c/call + 5.9 c/min (inc 22% VAT)
From any mobile operator subscription:
8.21 c/call + 16.9 c/min (inc 22% VAT)
When calling from abroad the price is determined by the local operator.