Close
Search for:

NCC News in Finland

07/07/2010
NCC Roads recycles and preserves the environment A gravel road repair method utilising old road material and waste material from steel factories preserves the environment and road structure construction materials.

30/04/2010
New perspectives found in NCC Environmental Seminar NCC organised an environmental seminar at Vanha Ylioppilastalo, Helsinki on 28 April. The afternoon seminar was attended by over one hundred key individuals from the real estate and construction industries.

16/04/2010
A block of flats with energy class a being built in Kaleva in Tampere NCC builds energy-efficient homes. We take the environmental perspective into account in the design and building of new housing projects in a variety of ways.

08/04/2010
NCC launches construction of an energy class A office building in Leppävaara NCC is continuing the construction of regional centre in Leppävaara, Espoo by launching the first stage of the new Business Park, Alberga A. All in all, five office buildings are to be constructed with a total gross floor area of 34,000 m2. Special attention has been paid to the energy consumption and other environmental effects of the buildings.

22/02/2010
Saarni in Turku's Westpark is an energy class A block of flats NCC builds energy-efficient homes. We take the environmental perspective into account in the design and building of new housing projects in a variety of ways.

26/01/2010
Green Building project of NCC and Lemminkäinen The construction of the third building in Polaris Business Park has been started in Espoo.

14/01/2010
NCC to construct shopping center and housing for over EUR 40 million NCC Construction Ltd has been commissioned to construct a new shopping center and 255 apartments in the Myllypuro area of Helsinki, Finland.

13/01/2010
NCC Builds energy-efficient homes The first energy class A residential buildings will be built in the Riverside area in Värttö, Oulu.

20/11/2009
New residential area to be built in Vesirattaanmäki NCC constructs an environmentally friendly residential area in Vesirattaanmäki, Espoo.

04/11/2009
The third stage of Plaza business park NCC brings the fourth generation business facilities to the market. The third stage of Plaza is launched in Aviapolis in Vantaa – in all five NCC Business Park buildings.

Contact information

NCC companies
PL 13
FI-00281 Helsinki
Tel. +358 10 507 51
E-mail: viestit@ncc.fi

 

Prices for 010 numbers

From a domestic landline phone: 8.21 c/call + 5.9 c/min (inc 22% VAT)

From any mobile operator subscription:
8.21 c/call + 16.9 c/min (inc 22% VAT)

When calling from abroad the price is determined by the local operator.

 
Tell a friend Jaa tämä sivu
Tell a friend

Tell a friend

You wish to tell your friend about page "News."

Your friends email address

If you want to send a message to more than one friend, separate email addresses with commas.

Your own name or email

Your message


 

Back to top