
NCC is short for Nordic Construction Company. NCC’s history started at the end of the 19th century with ship owners in Gothenburg, Sweden. The star in the company logo refers to the Nordstjärna family – the Northern Star (Nordstjärn) has led our way for a long time. NCC companies in Finland are NCC Construction, NCC Property Development and NCC Roads.
1996: Sweden’s second-largest construction company, NCC AB, acquired the construction and construction design business of Finnish Puolimatka. NCC Puolimatka Oy started business on 1 January 1996.
1997: NCC-Puolimatka International Oy was established.
1998: Residential business and engineering construction business were started.
1999: Subsidiary Seinälevy Oy’s capital stock was sold to Ansion Sementtivalimo Oy.
1999: The company name was changed to NCC Finland Oy on 1 October 1999.
2000: Precast concrete business started.
2000: Interasfaltti Oy was acquired.
2000: The Export Unit was renamed NCC International Oy on 1 June 2000.
1 January 2002: The industrial business segment was divided into two parts: Roads (asphalt, stone material and precast concrete business) and Altima (construction machinery rentals). The engineering construction and telecom sectors were shut down.
1 July 2002: NCC’s building machinery and equipment rental business in Finland continued under the name of Altima Oy.
1 January 2002: NCC Finland Oy was divided into NCC Construction Ltd, NCC Property Development Oy and NCC Roads Oy.
1 January 2004: Altima Oy became an independent company, no longer connected to the NCC Group.
2008: NCC Roads Oy acquired the operations of Valtatie Oy from the French Colas Group.
1947: Armas Puolimatka established his construction company.
1963: Building parts business started.
1964: Construction design business started.
1972: First projects in Russia.
1985: Company owner Hankkija; in 1990, Hankkija became Novera Group.
1992: Novera’s bankruptcy; new owner Kansallis-Osake-Pankki Bank.
NCC Companies
PO Box 13
FI-00280 Helsinki
Tel. +358 10 507 51
E-mail: viestit@ncc.fi
From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 23% VAT)
From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 23% VAT)
When calling from abroad the price is determined by the local operator.