
NCC companies in Finland
NCC Construction Ltd.
PO Box 13, FI-00281 Helsinki
Visiting address: Mannerheimintie 103a
Tel. +358 10 507 51
Fax +358 10 507 5262
E-mail: viestit@ncc.fi
NCC Property Development Oy
PO Box 13, FI-00281 Helsinki
Visiting address: Mannerheimintie 105
Tel. +358 10 507 51
Fax +358 10 507 5318
E-mail: pd@ncc.fi
NCC Roads Oy
Visiting address: Äyritie 8 C
FI-01510 Vantaa
Tel. +358 10 507 6800
Fax +358 10 507 6801
E-mail: nccroads@ncc.fi
Optiplan Ltd.
PO Box 48, FI-00281 Helsinki
Visiting address: Mannerheimintie 105
Tel. +358 10 507 6000
E-mail: optiplan@optiplan.fi
NCC Stroitelstvo ZAO (Construction)
NCC Real Estate LLC (Housing)
Nevsky pr. 114-116, lit. A
St. Petersburg, 191025 Russia
Tel. +7-812-329 9225
Fax +7-812-329 9223
E-mail: info@nccnw.spb.ru (Construction)
E-mail: info@nccr.ru (Housing)
NCC Ehitus AS (Construction)
NCC Elamuarendus OÜ (Housing)
NCC Property Development OÜ
Kalasadama 4
Tallinn 10415, Estonia
Tel. +372-627 4880
Fax +372-627 4881
E-mail: info@ncc.ee (Construction)
E-mail: elamuehitus@ncc.ee (Housing)
NCC Konstrukcija SIA (Construction)
NCC Housing Development SIA (Housing)
NCC Property Development SIA
Brivibas gatve 224 k-5, Riga
LV-1039 Latvia
Tel. +371-6756 7841
Fax +371-6756 7486
E-mail: info@ncc.lv (Construction)
E-mail: dzivokli@ncc.lv (Housing)
NCC AB (Sweden)
SE-170 80 Solna
Visiting address: Vallgatan 3
Tel. +46-8-585 510 00
Fax +46-8-857 775
E-mail: info@ncc.se
NCC (Norway)
Innspurten 9, 0663 Oslo
Postboks 93, Sentrum
NO-0101 Oslo
Tel. +47-2298 6800
Fax +47-2298 6801
NCC (Denmark)
Tuborg Havnevej 15
DK-2900 Hellerup
Tel. +45-3910 3910
Fax +45-3910 3920
E-mail: info@ncc.dk
Ritva Norrgrann
Head of Communications
Tel. +358 10 507 5432
E-mail is formed as follows: etunimi.sukunimi@ncc.fi
From a domestic landline phone: 8.28 c/call + 5.95 c/min (inc 22% VAT)
From any mobile operator subscription:
8.28 c/call + 17.04 c/min (inc 22% VAT)
When calling from abroad the price is determined by the local operator.