Contact information

NCC companies in Finland

NCC Construction Ltd

PO Box 13, FI-00281 Helsinki
Visiting address: Mannerheimintie 103a
Tel. +358 10 507 51
Fax +358 10 507 5262
E-mail: viestit@ncc.fi
Regional offices

NCC Property Development Oy

PO Box 13, FI-00281 Helsinki
Visiting address: Mannerheimintie 105
Tel. +358 10 507 51
Fax +358 10 507 5318
E-mail: pd@ncc.fi

NCC Roads Oy

Visiting address: Äyritie 8 C
FI-01510 Vantaa
Tel. +358 10 507 6800
Fax +358 10 507 6801
Sähköposti: nccroads@ncc.fi

Optiplan Ltd

PO Box 48, FI-00281 Helsinki
Visiting address: Mannerheimintie 105
Tel. +358 10 507 6000
E-mail: optiplan@optiplan.fi
www.optiplan.fi

 

NCC in Russia and the Baltic countries

NCC Stroitelstvo ZAO (Construction)
NCC Real Estate LLC (Housing)
Nevsky pr. 114-116, lit. A
St. Petersburg, 191025 Russia
Tel. +7-812-329 9225
Fax +7-812-329 9223
E-mail: info@nccnw.spb.ru (Construction)
E-mail: info@nccr.ru (Housing)
www.nccr.ru

NCC Ehitus AS (Construction)
NCC Elamuarendus OÜ (Housing)
NCC Property Development OÜ
Kalasadama 4
Tallinn 10415, Estonia
Tel. +372-627 4880
Fax +372-627 4881
E-mail: info@ncc.ee (Construction)
E-mail: elamuehitus@ncc.ee (Housing)
www.ncc.ee

NCC Konstrukcija SIA (Construction)
NCC Housing Development SIA (Housing)
NCC Property Development SIA
Brivibas gatve 224 k-5, Riga
LV-1039 Latvia
Tel. +371-6756 7841
Fax +371-6756 7486
E-mail: info@ncc.lv (Construction)
E-mail: dzivokli@ncc.lv (Housing)
www.ncc.lv

 

NCC Group companies

NCC AB (Sweden)
SE-170 80 Solna
Visiting address: Vallgatan 3
Tel. +46-8-585 510 00
Fax +46-8-857 775
E-mail: info@ncc.se
www.ncc.se

NCC (Norway)
Innspurten 9, 0663 Oslo
Postboks 93, Sentrum
NO-0101 Oslo
Tel. +47-2298 6800
Fax +47-2298 6801
www.ncc.no

NCC (Denmark)
Tuborg Havnevej 15
DK-2900 Hellerup
Tel. +45-3910 3910
Fax +45-3910 3920
E-mail: info@ncc.dk
www.ncc.dk

NCC Deutschland GmbH
Am Bahnhof 1
15517 Fürstenwalde
Tel. 0 33 61/67 00
Fax 0 33 61/67 04 57
www.nccd.de

More information

Ritva Norrgrann
Head of Communications
Tel:+358 10 507 5432

Prices for 010 numbers

From a domestic landline phone: 8,35 c/call + 6,00 c/min (inc 24% VAT)

From any mobile operator subscription: 8,35 c/call + 17,17 c/min (inc 24% VAT)

When calling from abroad the price is determined by the local operator.